Your custom screens are on the way — 3–4 weeks until they arrive. Use this time to prepare. A smooth installation starts before the box is opened.
4 Weeks Before: Finalise Measurements
- Re-measure every opening (3 positions each, take minimum)
- Photograph each window again
- Confirm colour choices match window frames
- Verify pet-resistant mesh where needed
- Confirm delivery address via WhatsApp
2 Weeks Before: Prepare Tools
| Tool | Essential? |
|---|---|
| Power drill + drill bits | ✅ |
| Spirit level | ✅ |
| Tape measure | ✅ |
| Phillips screwdriver | ✅ |
| Pencil | ✅ |
| Silicone sealant + gun | Recommended |
| Stud/wire detector | Recommended |
| Vacuum cleaner | For cleanup |
1 Week Before: Prepare the Site
- Clear furniture away from windows and doors (1m clearance)
- Clean window frames thoroughly
- Check frame condition: rot, rust, or cracks?
- Remove old screen hardware if replacing
- Test that windows open and close smoothly
Installation Day: The Setup
- Start early — morning light helps
- One room at a time
- Keep the manual open
- Charge your phone — for WhatsApp video support
- Have a helper — especially for doors
Post-Installation
- Test 10 cycles per screen
- A4 paper seal test on all edges
- Photograph completed work
- Register your warranty via WhatsApp
FAQ
Q: What tools do I absolutely need?
A: Power drill, spirit level, tape measure, and Phillips screwdriver are non-negotiable.
Q: Can I install screens by myself?
A: Windows: solo-possible. Doors: strongly recommend a helper.
Q: What if my window frame isn’t perfectly square?
A: Use the minimum measurement. Accept a small gap (2–4mm) and fill with silicone sealant.
Q: Should I paint before or after screen installation?
A: BEFORE. Paint splatter on mesh is nearly impossible to remove.
Q: What if I don’t have all tools on installation day?
A: Postpone. A rushed installation leads to poorly mounted screens.
Order Now → | WhatsApp: +86 19867294005
