A new home renovation involves hundreds of decisions. Mosquito screens might seem minor—but get the timing wrong, and you’ll deal with rework, delays, or screens that don’t fit.
Here’s exactly when to measure, order, and install screens during a Malaysian home renovation.
Why Timing Matters
| Too Early | Too Late |
|---|---|
| Renovation dust clogs tracks and cassettes | You move in, get bitten, and panic-buy whatever’s available |
| Paint and cement splatter on mesh | Off-the-shelf screens rarely fit your windows |
| Movers damage screen frames | Rush to buy local stock at 50% premium |
| Window adjustments make screens the wrong size | Installation disturbs your settled home |
The Optimal Timeline
Get keys ── Week 1: Measure ── Week 2: Order ── Weeks 3–6: Production + Shipping
│
Reno: Electrical → Plumbing → Masonry → Carpentry → Painting → Screen Install → Clean → Move In
↑ Week 5–6
Week 1: Measure Immediately After Getting Keys
Before renovation starts, measure every window. The frames are still bare—no construction materials obstructing access.
What to do:
- Count all windows and doors needing screens
- Measure each precisely (follow our Buying Guide)
- Photograph each window: full view + close-up of frame structure
- Determine: interior or exterior mount? Is frame depth sufficient?
Week 2: Order Before Renovation Begins
Order early—before contractors start work.
Why so early? VISTA HOME’s production takes 7–10 business days + 7–14 days sea freight = 3–4 weeks total. Order in Week 2 → screens arrive during Weeks 5–6 → installed right after painting.
Bonus: You lock in the price. No need to scramble later.
Week 5–6: Install After Painting
Painting is the last messy, dusty renovation step. After paint dries, install screens—before final cleaning.
Why this window works:
- Dust-heavy phases (masonry, carpentry, painting) are complete—no screen contamination
- Screen installation creates minor dust (drilling)—final cleaning handles it
- Screens are in place when you open windows to ventilate paint fumes
Week 7: Inspect Before Moving In
Final week before move-in:
- Every screen slides/folds/retracts smoothly
- All closures seal fully (no visible gaps)
- Folding screens retract flush against the frame
- Roll-up screens lock securely when pulled down
- No transport or installation damage to mesh
Three Renovation Scenarios
Scenario A: Full Renovation (Bare Shell / Gut Job)
| Timeline | Action |
|---|---|
| Week 1 | Measure all windows |
| Week 1 | Place order (3–4 week lead time) |
| Weeks 1–5 | Electrical → Plumbing → Masonry → Carpentry → Painting |
| Week 5–6 | Screens arrive. Install after paint dries. |
| Week 6–7 | Final clean + inspection + move in |
Scenario B: Window Replacement
| Timeline | Action |
|---|---|
| After new windows installed | Measure immediately (NOT from old window dimensions!) |
| Same day | Place order |
| 3–4 weeks later | Screens arrive, install |
New windows can differ by 5–10mm from old ones—enough to make screens not fit.
Scenario C: Already Living There, Just Adding Screens
| Timeline | Action |
|---|---|
| This weekend | Measure + order |
| Within 24 hours | WhatsApp confirmation |
| 3–4 weeks later | Receive + install (1–2 days) |
Do the whole house in one go. Staggered installation creates repeated dust and disruption.
Common Horror Stories
“Finished renovation, then thought about screens. Bought off-the-shelf sliding screens from the hardware store. Living room was 1cm too wide to fit. Kitchen was 5mm too narrow, leaving gaps on both sides. Ended up ordering custom from VISTA HOME anyway, wasting RM800.” — JB terrace homeowner
“Installed screens before painting. Painter sprayed the frame edges and got paint on the mesh. Couldn’t clean it off. The screen looked permanently dirty.” — KL Cheras condo owner
Renovating? Measure now, order early.